AQA 2019 Further Maths 7367/3d
35 questions50 marks120Updated December 2025
The AQA 2019 Further Maths 7367/3d paper in full: all 35 questions, each with its answer. AQA is the AQA. Sit it cold under exam timing, mark it, then work back through anything you missed using the solutions below.
Download the original PDF →Questions and answers are free. Full step-by-step worked solutions unlock with a free account. Start practising.
Question
3 marksDeduce the range of values that must satisfy.
Question
1 markWrite down the value of the variable which corresponds to the optimal value of .
Question
1 markDraw
Question
2 marksUsing Euler's formula for connected planar graphs, show that has exactly 5 faces.
Question
3 marksOre's theorem states that a simple graph with vertices is Hamiltonian if, for every pair of vertices and which are not adjacent,
degree of + degree of
where
Using Ore's theorem, prove that the graph is Hamiltonian.
Fully justify your answer.
degree of + degree of
where
Using Ore's theorem, prove that the graph is Hamiltonian.
Fully justify your answer.
Question
Question
3 marksProve that is a generator of .
Fully justify your answer.
Fully justify your answer.
Question
4 marksShow that .
Fully justify your answer.
Fully justify your answer.
Question
Question
2 marksExplain why has no subgroups of order 3
Fully justify your answer.
Fully justify your answer.
Question
3 marksFind all of the subgroups of .
Question
5 marksTo monitor all of the parking bays, the traffic warden needs to walk along every street in the town centre at least once, starting and finishing at the same street corner.
Find the shortest possible time, to the nearest minute, it can take the traffic warden to monitor all of the parking bays.
Fully justify your answer.
Find the shortest possible time, to the nearest minute, it can take the traffic warden to monitor all of the parking bays.
Fully justify your answer.
Question
1 markExplain why the actual time for the traffic warden to walk along every street in the town centre at least once may be different to the value found in part (a).
Question
Question
1 markCalculate the value of the cut \{S, A, B, C\} \{D, E, F, G, H, T\}.
Question
1 markExplain, in the context of the question, what can be deduced from your answer to part (a)(i).
Question
Question
2 marksUsing the initial feasible flow shown in Figure 1, indicate on Figure 2 potential increases and decreases in the flow along each arc.
Figure 2

Figure 2

Question
4 marksUse flow augmentation on Figure 2 to find the maximum flow through the manufacturing complex.
You must indicate any flow augmenting paths clearly in the table and modify the potential increases and decreases of the flow on Figure 2.

Maximum Flow =
You must indicate any flow augmenting paths clearly in the table and modify the potential increases and decreases of the flow on Figure 2.

Maximum Flow =
Question
2 marksThe management of the manufacturing complex want to increase the maximum amount of water which can flow through the system of pipes. To do this they decide to upgrade one of the water pipes by replacing it with a larger capacity pipe.
Explain which pipe should be upgraded.
Deduce what effect this upgrade will have on the maximum amount of water which can flow through the system of pipes.
Explain which pipe should be upgraded.
Deduce what effect this upgrade will have on the maximum amount of water which can flow through the system of pipes.
Question
Question
2 marksComplete the activity network for the project on Figure 3.


Question
3 marksFind the earliest start time and the latest finish time for each activity and show these values on Figure 3.
Question
1 markWrite down the critical path(s).
Question
Question
2 marksUsing Figure 4, draw a resource histogram for the project to show how the project can be completed in the shortest possible time. Assume that each activity is to start as early as possible.


Question
2 marksThe racing team's boss assigns two members of the racing team to work on the project.
Explain the effect this has on the minimum completion time for the project.
You may use Figure 5 in your answer.

Explain the effect this has on the minimum completion time for the project.
You may use Figure 5 in your answer.

Question 1
1 markDeanna and Will play a zero-sum game.
The game is represented by the following pay-off matrix for Deanna.

Which strategy is Deanna's play-safe strategy?
Circle your answer.
The game is represented by the following pay-off matrix for Deanna.

Which strategy is Deanna's play-safe strategy?
Circle your answer.
- A.A
- B.B
- C.C
- D.D
Question 2
1 markThe graph D is shown in the diagram below.

Which of the graphs below is a subdivision of D?
Circle your answer.


Which of the graphs below is a subdivision of D?
Circle your answer.

- A.Graph shaped like the letter 'L'
- B.Graph shaped like the letter 'I'
- C.Graph shaped like the letter 'N'
- D.Graph shaped like the letter 'K'
Question 3
The Simplex tableau below is optimal.


Question 4
The connected planar graph has the adjacency matrix


Question 5
The set is defined as
where
The group is formed by under matrix multiplication.
The group is defined as , where
where
The group is formed by under matrix multiplication.
The group is defined as , where
Question 6
A council wants to monitor how long cars are being parked for in short-stay parking bays in a town centre. They employ a traffic warden to walk along the streets in the town centre and issue fines to drivers who park for longer than the stated time.
The network below shows streets in the town centre which have short-stay parking bays. Each node represents a street corner and the weight of each arc represents the length, in metres, of the street.
The short-stay parking bays are positioned along only one side of each street.

The council assumes that the traffic warden will walk at an average speed of 4.8 kilometres per hour when not issuing fines.
The network below shows streets in the town centre which have short-stay parking bays. Each node represents a street corner and the weight of each arc represents the length, in metres, of the street.
The short-stay parking bays are positioned along only one side of each street.

The council assumes that the traffic warden will walk at an average speed of 4.8 kilometres per hour when not issuing fines.
Question 7
Figure 1 shows a system of water pipes in a manufacturing complex.
The number on each arc represents the upper capacity for each pipe in litres per second. The numbers in the circles represent an initial feasible flow of 38 litres of water per second.
Figure 1

The number on each arc represents the upper capacity for each pipe in litres per second. The numbers in the circles represent an initial feasible flow of 38 litres of water per second.
Figure 1

Question 8
A motor racing team is undertaking a project to build next season's racing car. The project is broken down into 12 separate activities A, B, ..., L, as shown in the precedence table below. Each activity requires one member of the racing team.